Jefferson County, Missouri is zone 4 under DOE's climate map (Mixed-Humid), which means real heating and real cooling seasons both, roughly balanced across the year. An uninsulated attic there should be built up to R-60. Topping up a typical 1,000-square-foot attic from bare joists (R-2) to R-60 runs an estimated $3,480, and saves about $1,474 a year in heating and cooling — a payback around 2.4 years.

Hard to find a home improvement with a faster payback than this.

Where the savings come from

$3,480Install cost
$1,474Annual savings
R-60DOE target

Of that, about $1,257/year comes from reduced heating and $217/year from reduced cooling load through the ceiling. Jefferson County beats 51% of the counties in this 3,171-county dataset on estimated insulation savings. Among the 825 counties DOE places in zone 4, Jefferson County ranks 222nd. Against Missouri's own average of $1,534/year, Jefferson County runs 4% below that.

The climate data behind this

The heating and cooling degree days behind this estimate — 4,700 HDD and 1,352 CDD (base 65°F, 1991-2020 normals) — come from Festus, MO US, the nearest NOAA station with published normals, 8.1 miles from Jefferson County's center. That combined heating-and-cooling load ranks Jefferson County 1504th nationally by total degree days — the 53rd percentile. DOE also classifies Jefferson County as moisture regime A (humid) - ask a local contractor whether that changes the vapor-barrier approach for this job.

The smaller top-up scenario

A shallower starting point changes the math: with R-11 already down, only the gap to R-49 needs filling, at roughly $2,280 for an estimated $215/year saved (~10.6-year payback). It is close - the payback only just fits a reasonable timeframe.

Quotes and materials for this job

Real bids depend on how easy the attic is to reach and whether old insulation needs removing first, so treat $3,480 as a starting estimate for a Jefferson County job, not a quote. You should get more than one quote before signing anything - expect at least a $600 minimum charge from most contractors.

More on how this was built

Nothing here is a guess: the methodology guide names the DOE climate map and NOAA station data behind every number on this page. See the DIY vs. contractor guide for whether a job this size is realistic to do yourself.